Factory maintenance schedule

Benelli TRK 702 maintenance schedule

By · Updated

The service intervals in the Benelli TRK 702 factory schedule (2025–), with the source they come from. Rydger can open with this model already filled in, so your reminders start from the right plan.

Sold in Spain as the TRK 702 X; same bike, same schedule.

Service intervals

TaskInterval
Oil changeEvery 6,000 km or 12 months, whichever comes first
Oil filter changeEvery 6,000 km
Air filter (replace)Every 12,000 km
Spark plugs (replace)Every 24,000 km; first at 19,000 km
Valve clearance checkEvery 24,000 km
Coolant changeEvery 24,000 km or 36 months, whichever comes first
Brake fluid changeEvery 24 months
Chain lubrication/checkEvery 500 km

Source: Benelli TRK 702 / TRK 702X (EU5+) user manual, Spanish, December 2024 edition, hosted on Benelli's media CDN (cdn.keeway.com, linked from benelli.com es-es) — maintenance table PDF pages 50–55 (printed 6-3 to 6-8), legend and repeat rule on printed page 6-2; after the 5th service (25,000 km) the cycle restarts from the 2nd, so valves and coolant repeat every 24,000 km from the first service at 25,000 km. Spark plugs first at 19,000 km, then every 24,000 km; fuel filter and timing chain tensioner left out Open the manual (PDF)

Intervals compared with this source on .

Always check your motorcycle's owner's manual. Intervals can change with the market, the model year and how you ride, and the manual is what your dealer and warranty follow.

Other models